298 EZ files tab

 
Main: Project > Import > IHS 298 EZ Loader...

The files tab selects the 298 file, and how the data should be imported.  It’s possible to load unallocated data, allocated data, or both allocated and unallocated data at the same time.  Selecting the type of import creates an entry box (or entry boxes) for the 298 file location.

Load UN-ALLOCATED Production File Only

Loads unallocated data. Selecting this option creates only a single entry box for the import file location.

Load ALLOCATED Production File Only

Loads allocated data.   Selecting this option creates only a single entry box for the import file location.  Allocated production will have a “A” prefix

Load and SUM UNALLOCATED and ALLOCATED Production Files Together

loads unallocated and allocated data simultaneously.  There will be two entries for the two files: Allocated and Unallocated.

When importing Texas data, use the “Allocated and Unallocated” option.  For Texas data, oil completions are only imported from the allocated data and gas completions are only imported from the unallocated data.   For wells completed as a gas well and later recompleted as an oil well in the same formation, this import option will sum the two together.  Louisiana data can use either the “Allocated or Unallocated” option.